llwyn onn water treatment works

Demolition of former Water Treatment Works
Wrexham, UK

Demolition of former Water Treatment Works carried out beside a live 19 million litre capacity reservoir that was perceived as a structural failure risk and had to be protected at all times.

Key Issues:

  • Protection of live 19 million litre capacity reservoir
  • Extensive sub-structures
  • Working on a live utilities site
  • Asbestos removal
  • Dust suppression
  • Noise minimisation
  • Vibration monitoring